360-746-0859  |  4041 Home Rd Ste A, Bellingham, WA 98226

Residential Solar

Solar Equipment

Solar Equipment

A primer on the main components of a solar PV system

Net Metering

Net Metering

Bank your excess solar power with your utility

Financial Incentives

Financial Incentives

A look at solar tax incentives, energy savings, and increased property values

3-Step Bidding Process

3-Step Bidding Process

Free site assessment through the design process

3-Step Installation

3-Step Installation

Permitting through installation and interconnection

Western Solar Warranties

Western Solar Warranties

No-leak workmanship, labor, and equipment warranties

Related Articles

Schedule a Free Site Visit

  • Work was completed 3 weeks early! Josh and all other support staff were very responsive to my emails.
    Jonathan W.4.32 kW solar PV system, Mount Vernon
  • Working on a historic house, parts of which are over 125 years old, can create problems for securing panels. Western Solar spent the time and effort to complete the project, even a month early! So now the Tennant house overlooking Tennant Lake in Ferndale WA has Western Solar panels producing green power!
    Kenneth F.4.42 kW solar PV system, Ferndale
  • Western Solar staff was a pleasure to deal with in all aspects of this project. I think they have a good product along with excellent personnel and customer support.
    Dennis P.4.32 kW solar PV system, Mt. Vernon
  • Working with Western Solar was exceptional from initial sales inquiry all the way through to project completion and system activation. They have provided us with a complete turn-key solution with superior customer service. Communication with all members of their team have been professional and timely with the attitude that the customer always comes first. I am very impressed with Western Solar and would highly recommend them to anyone considering a solar system.
    Bill C.5.94 kW Solar PV System, Burlington
  • Thanks for making this happen in such a tight timeframe!  We appreciate your hard work.
    Darrin D.5.76 kW solar PV system, Bellingham
  • Your entire team made this project a dream come true for us. The planet and the Palmers thank you!
    Bill and Kaye P.2.88 kW solar PV system, Bellingham